09Pre-migration check
Run a five-point quality check on every CSV
Catch delimiter, encoding, blank key, duplicate, and date-format problems before data enters a live system.
BEFORE
AFTER
01 / Do it yourself
From zero to working.
Read the complete sequence before starting. Use a test account or non-production copy whenever the workflow touches important business data.
-
01
STEP 1
Open a copy in a plain-text-aware editor and confirm UTF-8.
-
02
STEP 2
Check headers, delimiters, and required key columns.
-
03
STEP 3
Count blank keys and duplicate keys.
-
04
STEP 4
Test ten representative rows in a non-production import.
02 / Check before you change
Useful guardrails.
✓Never test first in production
✓Watch dates like 04/05/2026
✓Preserve leading zeroes
✓Reconcile rejected rows
Do it for me
Stuck? Send this page to Chaitanya.
Message at any hour with the guide link and a screenshot. Get a quick answer, a guided working session, or a complete setup configured for your workflow.